Find your charging approach

EV Charging for the Way Your Site Works

Overnight at home. Between fleet shifts. During a stop along the way. Choose a charging approach around how long vehicles stay and the power your site can provide.

Illustrative Indian charging site with an electric car connected to a freestanding charger
Visualisation · Illustrative visualization · Not an EHUB installation

The starting point

Start with dwell time, vehicle needs and available power.

Managed AC charging can suit longer stays at apartments and workplaces. Fleets need a plan tied to departure times, while short-stop destinations may need DC charging. Vehicle compatibility and electrical capacity determine the final mix.

Designed for

Built around your setting.

The right charging approach depends on who uses the site, how long they stay, the available electrical capacity and who will operate the system.

EV drivers
Apartment communities
Fleet operators
Retail property owners
Franchise partners

How it works

From site plan to daily use.

01

Match the charger to the visit

Estimate how much energy vehicles need during a typical visit. Use that requirement to compare charger capacity, bay numbers and access arrangements.

  • Home and workplace charging
  • Fleet depots
  • Retail destinations
  • Public and highway sites
02

Build a practical delivery plan

A site review brings together the electrical work, equipment, permissions and operating setup. The resulting scope forms the basis for costs and delivery timing.

  • Site and load assessment
  • Charger and bay layout
  • Billing and access setup
  • Commissioning and handover

AC and DC charging

Shared and private access

Payment and billing options

Site-specific operating models

Next step

Let’s talk about your site.

A few details are enough to begin. We can work through the technical questions together.

Let’s talk

Your project.
A conversation to start.

Tell the team your city, the kind of site you have in mind and what you want charging to make possible.

Project
Solutions
Based in
Hyderabad, India

Email opens your email app; calling opens your phone app. You choose when to send or call.

Clear answers

Solutions FAQ

Should I choose AC or DC charging?+

It depends on vehicle compatibility, daily energy needs and the time available to charge. AC can suit longer parking periods; DC can support shorter stops where the vehicle and site power supply allow it.

Can a site start with a small number of chargers?+

Yes, a phased design can begin with current demand while reserving space and electrical routes for expansion. Future capacity still depends on the available supply and any required upgrades.

What does a charging proposal cover?+

Ask for the charger specification, electrical and civil work, software and connectivity, permissions, commissioning and support scope. Commercial responsibilities and exclusions should be clear before approval.